Engineered for 50 years underground.

HURRICANE HD 1000 heavy-duty stormwater attenuation crate —
engineered to carry over 85 tonnes of vertical pressure per combined set.
Designed to exceed AASHTO H-20/HS-25 standards. Factory-direct global supply to North America, Europe, Australia, and the Middle East.
What Is an Attenuation Crate?An attenuation crate is a structural plastic module that interlocks with identical units to form an underground storage basin for stormwater. Crate by crate, the modules grow into an attenuation tank of any required volume — which is why specifiers often use the two terms interchangeably: the crate is the building block, the tank is the finished system. During a storm, runoff fills the open matrix of the crates; between storms, a flow-control device releases the stored water at a rate the receiving network can handle. The YYRH-MR1000-HD (HURRICANE HD) is our heavy-duty grade attenuation crate,rated for over 85 tonnes of vertical load per square metre and 45 tonnes of lateral resistance, with a 90–92% void ratio (ISO 7198). Each 1000×500×200 mm unit adds 0.1 m³ of storage at roughly 6.7 kg per plate, so a full tank can be delivered in standard containers and assembled without heavy lifting gear. For the wider series — including 70T landscape and 45T residential grades — see the YYRH-MR attenuation tank range.

The Global Stormwater Challenge:

Infrastructure Limits Have Changed

From the sudden, intense flash floods of the Middle East and Australia to the severe freeze-thaw cycles in North America and Germany, climate volatility is pushing underground infrastructure to its breaking point. Traditional drainage systems reach capacity limits in hours. Standard plastic modules suffer structural collapse under heavy-duty traffic or deep burial conditions.
Stop guessing. Here is the verifiable data: The YYRH-MR1000 is a heavy-duty stormwater crate engineered with a vertical crush strength exceeding 85 tons/m² and lateral resistance over 45 tons/m². Utilizing molecular-level modified polymer, it prevents thermoplastic creep and structural collapse in extreme heavy-traffic infrastructure projects and deep burial environments up to 8 meters. You are not buying a plastic box. You are buying half a century of underground structural integrity.

The Triple Challenge Facing Civil Engineers

in Underground Stormwater Systems

The Structural Collapse Trap
In F900 load zones such as arterial roads, airport aprons,and logistics yards, long-term module failure from heavy traffic leads to pavementcollapse and business interruption. Most crates on the market crack because the data onthe spec sheet was never tested under real dynamic conditions. Remediation costs cansoar to 3-5 times the initial installation investment.
The "Laboratory Ideal Value" Deception
Manufacturer data often reflects “laboratory ideal values” rather than “actual installed values.” Submitting unverified specs leads to bid rejections, project delays, and even funding clawbacks.
The Slow Death by a Thousand Cuts
The degradation of inferior modules is a slow death: UV exposure, chemical erosion, and constant ground stress cause failure probabilities to spike after year 12, forcing complete system replacement long before the project's design life ends.

Moving Beyond Laboratory Ideals:

The Three New Pillars of Heavy-Duty Infrastructure

Authentic “System-Wide Load Sharing”Heavy traffic does not strike in isolation. Infrastructure requires an architecture designed to exceed AASHTO HS-25 standards, transferring localized overloads to adjacent modules and engaging them as a unified structural mat.
8-Meter Deep Burial Capability
50-Year Predictable Performance
Primary Engineering Parameters & Material Science Proof
High-Precision Molding & Architecture
High-Precision Molding & ArchitectureThe unit utilizes highly engineered Fluted Columns to increase the section's moment of inertia, resisting extreme vertical compression. Ribbed Columns provide necessary shear strength against lateral buckling.
Molecular-Level ModificationMolecular-Level Modification
Chemical InertnessChemical Inertness
YYRH-MR-1000-HD Full Technical Specification Table
Parameter
Value
Verification / Standard
Model Number
YYRH-MR1000
Official heavy-duty SKU
Vertical Load Capacity
≥ 85 tons (850 kN)
SGS-CSTC-2024-GF-08921, per EN 17152 compression at 5% deflection
Lateral Resistance
≥ 45 tons (450 kN)
SGS-CSTC-2024-GF-08922, per EN 17152 interlocking interface shear
Voids Ratio
90-92%
Volumetric displacement per ISO 7198, mean value verified over 5 samples
Module Volume
0.1 m³ per unit
Standard geometric external volume calculation
Single Plate Weight
≈ 6.7 kg
QC-YYRH-WGT-001, Weight of one single standalone plate
Combined Set Weight
Exactly 17.6 kg (Approved Mass)
Complete set including 2 plates + side components
Material Composition
PP (Food Grade Virgin PP(Polypropylene))
DSC thermal fingerprint verified
Installation Depth
0.8 - 3.5 meters (Standard)
Max system depth up to 8.0 -10.0meters tank height
Chemical Resistance
Continuous contact pH 3 - 11
ISO 175 Immersion Test, mass change < 0.5% over 28 days
Operating Temp.
-30°C to +50°C
ISO 9967 Creep Modulus Retention > 90% (full range)
Design Service Life
50+ Years (Structural)
ISO 9080 Long-term Hydrostatic Strength extrapolation
Six Core Structural Advantages

Translating Data Into Financial ROI

https://oss.yy-aicloud.com/uploads/20260608/6a265b48e8767400c3241004b5db7ca7f5abfef2794f2.jpg
01
Distributed Arch-Pillar Load Architecture
Eight main pillars combined with a crown arch design convert vertical pressure into axial compression rather than bending stress. Engineered with an exceptional strength-to-weight ratio (Single plate ≈ 6.7kg), it requires no heavy crane machinery on site. A crew of 3 can deploy 500 units in one shift, saving approximately USD 3.80-5.20 in handling costs per module.
02
Verified Lateral Shear Resistance Exceeding 45 Tons
Eight dovetail interlocking nodes per side resist lateral forces generated by vehicle braking and turning. This eliminates the need for external binding ties, saving roughly USD 1.15-1.85 in hardware costs per module and reducing installation labor by 22 minutes per square meter.
03
High Void Ratio Hydraulic Design
Material is strategically placed only where structurally required, achieving a highly efficient void ratio of 90-92%. For a 500 m³ attenuation project, excavation volume is only 525-530 m³, a 15-20% reduction compared to concrete tanks. This directly saves approximately USD 4,500-9,100 in excavation costs.
04
Thermally Stable PP Material Across Global Climates
PP block copolymer features a glass transition temperature of approx. -20°C. It maintains structural integrity across the entire -30°C to +50°C temperature range, making it equally reliable in North American/German freeze-thaw climates as it is in the Middle Eastern heat.
05
Optimized Interlocking Assembly
Individual plates clip perfectly together with side plates into an approved 17.6kg structural set, requiring no tools (45N insertion force). Installation labor is reduced by 60-70% compared to concrete tanks, lowering overall EPC contractor overhead.
06
Integrated Inspection and Maintenance Channel Architecture
Internal architecture forms continuous channels across all three axes, fully compatible with CCTV crawlers. This eliminates the need for dedicated inspection risers (which add USD 180-350 per access point in concrete tanks), preventing leakage risks from penetrating the waterproofing envelope.
https://oss.yy-aicloud.com/uploads/20260608/6a265c040b4f39914464f0e6bdfa960015601578bcf2c.jpg

Supply Chain Decision-Makers' Checkpoint

Ask any competitor for these four items before you sign an international procurement contract:
CABR</br> 50-year creep test certificate number
CABR
50-year creep test certificate number
(Verifying 50-year long-term underground stability)
Actual</br> physical load destruction test report (e.g., Fangyuan)
Actual
physical load destruction test report (e.g., Fangyuan)
proving vertical capacity >85T.
PP raw</br> material batch traceability record
PP raw
material batch traceability record
Ensuring virgin, non-recycled molecular integrity
On-site</br> installation supervisor availability
On-site
installation supervisor availability
for international project deployments.
If they cannot provide all four, ask yourself what you are paying for.
Physical Verification & Regulatory Compliance
50-Year Creep Performance (CABR Certified)
Tested by the National Center for Quality Inspection & Test of Building Engineering (CABR). Predicted deformation after 50 years under an 85T equivalent load stays below 1%. No collapse. No cracking. [Report Number: CABR BETC-T3AC-2025-02701]
Fangyuan Physical Load Verification
Actual physical tests for vertical and lateral load-bearing capacities show performance exceeding the 85T rated capacity by over 15%.
Global Engineering Compliance
Designed to exceed AASHTO H-20 / HS-25 highway loading standards and fully compliant with CE EN safety directives. Universally accepted by global engineering consultants.
Corporate Trust Signals
Recognized as an AAA Enterprise Credit company and an ISO 9001 certified facility.
50-Year Creep Performance (CABR Certified)Fangyuan Physical Load VerificationGlobal Engineering ComplianceCorporate Trust SignalsSupply Chain Decision-Makers' Checkpoint
Installing the YYRH-MR1000-HD Attenuation CrateAssembly is intentionally tool-free: side plates clip into the fluted columns at about 45 N of insertion force, and eight dovetail interlocks per side transfer braking and turning loads across the matrix — no external ties, welding, or adhesives. A three-person crew can place around 500 modules in a single shift,and because a single plate weighs only 6.7 kg, no crane is required on site. The standard sequence is: prepare and level the sub-base; wrap the excavation in an impermeable geomembrane; assemble the crates row by row into the design footprint; connect the inlet, outlet, and flow-control structure; then backfill in compacted layers. At a 0.8–3.5 m standard cover depth, the finished tank sits below parking lots, fire lanes, and container yards, and the ≥190 mm internal channels stay fully accessible to CCTV crawler inspection for the life of the system. Every container-volume order ships with installation drawings,and an on-site technical supervisor can support the first three days of assembly on request.
Global Field Deployment Case Studies
Calculable ROI & Global Procurement Logistics
Total Cost of Ownership (TCO)
Reduces the TCO net present value by approximately 62% over a 50-year operational lifecycle compared to concrete or inferior plastic systems.Total Cost of Ownership (TCO)
Commercial Risk Transfer
Backed by a 15-year structural warranty and a 35-year Hydraulic Performance Guarantee. This directly shifts long-term performance risk to the manufacturer, saving EPC contractors 8-12% in project contingency reserves.Commercial Risk Transfer
Factory-to-Site Global Logistics
Minimum Order Quantity (MOQ)1 × 40HQ container (holds approx. 700 combined sets via stackable/nestable design to maximize spatial efficiency).
Guaranteed Lead Time25–30 days ocean freight shipping directly to major global ports across North America, Europe, Australia, and the Middle East (including Jeddah, Dammam, Riyadh dry port).
Free On-Site Engineering SupportFor container-volume orders, our technical team provides full installation drawings. Upon request, we deploy an on-site technical supervisor for the first 3 days of installation at zero additional charge, ensuring absolute compliance during sub-base leveling and backfilling.
Initiate Your Procurement Process & Mitigate Project Risk
We operate as a primary manufacturer with 10 years of deep production expertise, outputting over 50,000 modules monthly. We fully support OEM manufacturing with your custom branding, and offer low MOQ support for regional pilot projects.
Request an Instant Factory Wholesale & Bulk Discount Quote
Download the Complete 85T
Crush Test & CABR 50-Year Creep Certificate Package
Download the Complete 85T<br> Crush Test & CABR 50-Year Creep Certificate Package
Request a Free CAD Layout & FEA Convergence Study for Your Site
Schedule a Direct Technical Video Call with Our Engineering Team
FAQ
Frequently Asked Questions for
Calculable ROI & Global Procurement Logistics
FAQ IconWhat cover depth does the MR1000-HD require?

The standard installation envelope is 0.8–3.5 m of cover; with engineered tank-height designs the system extends up to 8–10 m. Confirm your burial depth and pavement build-up with our engineering team so load verification matches your site conditions.

FAQ IconHow fast can an attenuation crate system be installed?

Assembly is tool-free — plates clip together at ~45 N insertion force and a single plate weighs 6.7 kg, so no crane is needed. A three-person crew places about 500 modules per shift, and interlocking assembly cuts labor by 60–70% versus a cast concrete tank of the same volume.

FAQ IconCan the YYRH-MR1000-HD be installed under driveways and parking lots?

Yes. The crate exceeds AASHTO H-20 / HS-25 highway loading, which covers cars, delivery vehicles, and fire-truck access lanes. With ≥85T vertical and ≥45T lateral capacity and a 0.8–3.5 m standard cover depth, it is specified for residential driveways, commercial parking, ports, and logistics yards alike.

FAQ IconHow does an attenuation crate differ from a soakaway crate?

A soakaway crate system lets stored water drain into the surrounding soil, while an attenuation crate holds water inside an impermeable geomembrane and discharges it slowly to a piped outlet. If ground conditions allow infiltration, a soakaway may suffice; where they do not, or where discharge must be limited, attenuation is the correct design. Our soakaway crates guide covers the selection factors.

FAQ IconWhat is an attenuation crate and when is it required?

An attenuation crate is a modular structural unit that builds an underground stormwater basin which buffers peak runoff and releases it at a controlled rate. It is required wherever the existing drainage network cannot absorb storm peaks — new developments, parking lots, roads, and municipal schemes subject to SuDS or stormwater-attenuation conditions of planning approval.

Contact Us yytank
X
WhatsApp yytank
Can i help?
Tel: +86-18550285468
Phone yytank
Get the Solution
Live ChatAI Chat
toTop
Transforming 500,000 m³ of Rainwater into Sustainable Value, Annually.
Transforming 500,000 m³ of Rainwater into Sustainable Value, Annually.
info@yy-tank.com

info@yy-tank.com

Tel: +86-18550285468Tel: +86-18550285468
Add: No. 686, Jianjiang East Road, Jiulongkou Town, Jianhu County, Yancheng City, Jiangsu Province, P.R.ChinaAdd: No. 686, Jianjiang East Road, Jiulongkou Town, Jianhu County, Yancheng City, Jiangsu Province, P.R.China
media-icon-0
media-icon-1
media-icon-2

MENU

  • Home
  • Products
  • Solutions
  • About Us
  • News
  • Contact Us

SOLUTIONS

  • Application
  • Wholesale Crates (45T Lateral)
  • Urban Sponge City
  • Heavy Duty Infrastructure
  • Competitor
  • Support
  • Installation Guide
  • Downloads
Get in touch today to discuss your products needs.
Leon Shen WhatsApp
Leon Shen WhatsApp
Dante Wang WhatsApp
Dante Wang WhatsApp
Mr. Shen WeChat
Mr. Shen WeChat

Copyright © Jiangsu Yingyuan Sponge City Technology Co., Ltd. All Rights Reserved.Technical Support: ProSrcTerms Of UsePrivacy Policy

YY Tank
HomeHomeProductsProductsinfo@yy-tank.cominfo@yy-tank.comAboutAboutContactContact
logo
  • Home
  • Products
  • Solutions
  • News
  • About Us
  • Contact Us
Select Language
  • 🇬🇧
    EnglishEnglish
  • 🇸🇦
    اللغة العربيةاللغة العربية
  • 🇫🇷
    FrenchFrench
  • 🇩🇪
    GermanGerman
  • 🇪🇸
    SpanishSpanish
  • 🇵🇹
    PortuguêsPortuguês
  • 🇮🇹
    ItalianoItaliano
  • 🇹🇷
    TürkçeTürkçe
Menu
Language
Home
Products
Stormwater Crates
YYRH-MR-1000-HD
YYRH-MR-1000-EW
YYRH-MR-1200-SD
YYRH-MR-1200-EW
Solutions
System
Commercial Drainage Systems
Municipal Drainage
Residential Drainage
Specialized Drainage Systems
Application
Wholesale Crates (45T Lateral)
Urban Sponge City
Heavy Duty Infrastructure
Port
Logistics Hub
Deep Burial
Fire Lane
Competitor
Support
Maintenance
Installation Guide
Downloads
News
Industry News
Company News
About Us
Contact Us
logo
  • Home
  • Products
  • Solutions
  • News
  • About Us
  • Contact Us
Select Language
  • 🇬🇧
    EnglishEnglish
  • 🇸🇦
    اللغة العربيةاللغة العربية
  • 🇫🇷
    FrenchFrench
  • 🇩🇪
    GermanGerman
  • 🇪🇸
    SpanishSpanish
  • 🇵🇹
    PortuguêsPortuguês
  • 🇮🇹
    ItalianoItaliano
  • 🇹🇷
    TürkçeTürkçe
Menu
Language
Home
Products
Stormwater Crates
YYRH-MR-1000-HD
YYRH-MR-1000-EW
YYRH-MR-1200-SD
YYRH-MR-1200-EW
Solutions
System
Commercial Drainage Systems
Municipal Drainage
Residential Drainage
Specialized Drainage Systems
Application
Wholesale Crates (45T Lateral)
Urban Sponge City
Heavy Duty Infrastructure
Port
Logistics Hub
Deep Burial
Fire Lane
Competitor
Support
Maintenance
Installation Guide
Downloads
News
Industry News
Company News
About Us
Contact Us