Advanced load capacities are paired with logical, rapid installation mechanics. Our modular architecture disrupts heavy-asset concrete construction, accelerating your project's Gantt chart and reducing manual labor overhead.
Excavation & Base Preparation
The high void ratio slashes required excavation volumes by over 30% compared to traditional gravel trenches, cutting soil export costs. Native soil must be leveled and compacted.
Geotextile Wrapping
The assembled matrix is strictly encapsulated within impermeable geomembranes (for attenuation) or permeable geotextiles (for soakaway) to establish a secure physical barrier against soil ingress.
Rapid Modular Assembly
With a single module mass precisely controlled at 6.7 kg, workers assemble the interlocking matrix entirely by hand. This completely eliminates the requirement for heavy lifting cranes on site.
Heavy Equipment Backfilling
Once the geocellular structure is secured and wrapped, the >85T load capacity allows for controlled, layered backfilling utilizing standard heavy excavators directly above the system.