Engineering Data Points Resolving Site Constraints




● Ensure the subgrade is fully compacted and leveled prior to placing the geotextile and geomembrane layers.
● Modules must be assembled utilizing the correct interlocking mechanisms to form a rigid, unified block. Adjacent modules must have no gaps.
● Backfilling must be executed in controlled layers. Trench backfilling should start from the bottom up symmetrically, utilizing manual operation to avoid mechanical impact.
Safety Compliance Notice:
Each project must undergo stress analysis to ensure the stability of the system under traffic loads . For details on deploying different models based on precise geotechnical data, contact us for custom specs.