background
Heavy Duty Stormwater Crates

Comprehensive Modular Stormwater & Drainage System Solutions

Future-Ready Sponge City & Full-Scenario Water Management Infrastructure

Jiangsu Yingyuan is committed to solving stormwater management challenges from residential yards to extreme specialized environments through rigorous engineering design and polymer material science. Our systems fully adopt polypropylene (PP) modular structure, achieving an ultra-high 90-92% void ratio. Compared to traditional gravel drainage solutions, we effectively reduce earth excavation volume by 58-68%. Whether handling light pedestrian traffic or supporting over 85 tons of heavy port equipment, Jiangsu Yingyuan systems deliver a reliable 50-60 year design life and long-term investment value.

Authoritative Certifications

  • ISO 9001 Quality Management System
  • CE European Standard Certification
  • LEED Green Building Credit Support Materials

Engineering Standards Compliance

  • Complete regulatory compliance documentation available,meeting stringent municipal infrastructure requirements.
合作伙伴 logo 1
合作伙伴 logo 2
合作伙伴 logo 3
合作伙伴 logo 4
合作伙伴 logo 5
合作伙伴 logo 6
合作伙伴 logo 7
合作伙伴 logo 8
合作伙伴 logo 9
合作伙伴 logo 1
合作伙伴 logo 2
合作伙伴 logo 3
合作伙伴 logo 4
合作伙伴 logo 5
合作伙伴 logo 6
合作伙伴 logo 7
合作伙伴 logo 8
合作伙伴 logo 9

Product Lines Tailored For Different Engineering Loads, Compliance Requirements, And Application Scenarios

Residential Systems

Residential Systems

Creating low-disturbance, cost-effective residential water environments

Engineering Specs: <30T light-duty load, individual component weight <10kg.

Key Advantages: 58-68% less excavation, DIY-friendly design, seamless integration withresidential landscaping.

Applications: Single-family residential yards, townhomes, driveways and patios.

icon

Residential Systems

Creating low-disturbance, cost-effective residential water environments

icon

Commercial Systems

Empowering commercial real estate with heavy load capacity and space efficiency

icon

Municipal Systems

Public safety foundation meeting stringent regulatory requirements

icon

Specialized Systems

Custom-engineered solutions for extreme environment challenges

bg
Core Engineering MetricsResidentialCommercialMunicipalSpecialized
Vertical Load<30T (Light Duty)>85T (Heavy Duty)>85T (Transit/Emergency)>85T (Extreme Heavy)
Installation EfficiencyDIY-Friendly~400m³/day~400m³/dayExpert Custom Implementation
Environmental ResistanceResidential GradeFull Oil/Chemical ResistantEnhanced Degradation & Flame Resistant-40°C to 120°C,Corrosion Resistant
System MaintenanceAnnual Visual/CleaningQuarterly Cleaning,Commercial StandardQuarterly Inspection,Strict ComplianceDedicated 24/7 Support,Regular Testing
Design Life50-60 Years50-60 Years50-60 Years50-60 Years
Commercial Heavy-Duty Retrofit (Commercial Systems)

Commercial Heavy-Duty Retrofit (Commercial Systems)

Regional shopping centerparking lot upgrade. Facing dual pressures of high foot traffic and limited constructiontimeline, commercial-grade PP modular systems were deployed, achieving installation completion in 4 days with zero business interruption, delivering a heavy-duty drainage andstorage system with 50-year design life.

Municipal Infrastructure (Municipal Systems)

Municipal Infrastructure (Municipal Systems)

Urban arterial road flood resilience reconstruction. To accommodate heavy transit and emergency vehicle traffic, >85T municipal-grade systems were installed in 7 days of rapid completion, minimizing city traffic disruption duration.

Extreme Corrosive Environment (Specialized Systems)

Extreme Corrosive Environment (Specialized Systems)

Coastal container port facilities. Facing high salinity, severe corrosion, and heavy port lifting equipment,customized specialized corrosion-resistant modules were deployed and delivered in 14 days, ensuring long-term reliability in maritime environments.

Residential Yard Construction (Residential Systems)

Residential Yard Construction (Residential Systems)

Suburban single-family home. In an extremely space-constrained backyard lot, lightweight components were used for rapid construction, completing installation in 2 days with earth excavation volume reduced by 60%.

sectionBg

Jiangsu Yingyuan is not only a solution designer, but also a manufacturing facility with strong production heritage, providing solid backing for large-scale municipal and commercial B2B procurement:

Scaled Manufacturing & Quality Control

Scaled Manufacturing & Quality Control

Fully automated polymer material injection molding production lines, with every product batch undergoing stringent full-scale load bearing testing and accelerated aging testing.

Agile Logistics & Delivery Network

Agile Logistics & Delivery Network

Find the precise solution matching your projects geological conditions and compliance requirements. Our engineering team will deliver customized system planning and detailed cost estimates based on on-site site assessment, stormwater runoff analysis, and load safety margins.
Schedule Project Assessment & Drawing Detailing Nowarrow
Technical Support Center
Request Installation Guidelines, technical specification documents.
Emergency Engineering & 24/7 Liaison
For critical infrastructure such as ports and data centers, please contact our specialized engineering team directly for dedicated line support.
Global Direct Phone / WhatsApp
+86-18550285468
Corporate Email
info@yy-tank.com
Factory & R&D Center Address
No. 686 East Jianjiang Road, Jiulongkou Town, Jianhu County
FAQ
Foire aux questions pour
Wholesale & Projects
FAQ IconEst-il vrai que l’installation modulaire permet de réduire le volume d’excavation de 58 à 68 % ?

Oui. Grâce au taux de vide élevé du système (90–92 %), pour obtenir un volume de stockage ou de drainage équivalent, il occupe beaucoup moins d’espace souterrain que les couches de graviers traditionnelles. Cela permet donc de réduire significativement les travaux d’excavation, d’évacuation des terres et de compactage du remblayage.

FAQ IconComment la capacité de charge supérieure à 85 tonnes est-elle vérifiée ?

Pour les applications commerciales, municipales et spécialisées, la capacité de charge verticale du système a fait l’objet d’une double vérification au moyen de modélisation hydraulique en laboratoire accrédité et d’essais physiques sur prototype grandeur nature. Les coefficients de sécurité dépassent largement les charges par essieu des véhicules d’urgence et engins portuaires classiques.

FAQ IconComment le système est-il conçu pour le nettoyage et l’anti-colmatage ? Les coûts de maintenance sont-ils élevés ?

Le système est conçu pour limiter les besoins de maintenance. Des regards d’inspection dédiés et des passages facilement accessibles sont prévus aux points clés des canalisations, permettant un rinçage rapide par jet d’eau haute pression. Pour les installations commerciales et municipales, seule une inspection visuelle et un nettoyage trimestriels sont nécessaires pour préserver le débit, ce qui réduit sensiblement les coûts d’exploitation à long terme.

toTopBack to Top